The new projects in the port

**Vital project inside the port:

1-Construction of new two berth’s

2-Construction of a tourist complex

3-Construction of a new grain soils

4-Laboratory of analyses

*1* New two berth’s :

-A quay with a length of /266/ m and water depth of /11/ m with a back yard of /160/ m wide

-A quay attached to the /266/ m long quay of /470/ m long with a Ro/Ro berth of 35 m wide

and aberth at its Western end of 12.5 m wide and a water depth of 15 m

In this respect we would point out that there are back yards which can be used to increase

the production capacity of the two quays, with a total area of a bout /50.000/ m2.

*2* Construction of a tourist complex:

A Tourist - commercial complex at the south Easterncorner of the port ,

covering an area of about /6000/ m2 ,and including a hotel with all its services

such as restaurants, halls for meetings and conferences a parking area and up-

to-date trading show rooms, this complex is expected to include in one part of

it a passenger hall that meets the requirements of tourism in syria

*3* Construction of new grain silos:

- The Construction of new grain silos to the north of the consolidation shed ,

with an area of about 700 m2 . propsed for construction of thgrain silos with a

capacity of 100.000 tons . this project is in the stage of checking the technical

offers .للأعلى

*4* Laboratory of analyses :

-The central laboratories were established at the border gates including

the border gate in Tartous Port under decree no.20/2006 to facilitate

and push up conducting the required analyses on the important

materrials through hese gates without need to transporting the samples

for long distances.

- The suitable place was arranged for Tartous laboratories close to the

single window with a storey area equal to 3000 m2 .

- contracts were concluded for the purchase of most of the equipment needed

for the labs , 50% nof has already arrrived at the port and these equipment is

under installation now , 25 % are at Lattakia port , for both ports are labs.

Established are divided into 4 dedicated labs :

1- Human food and animal food labs .

2- Chimical labs .

3- Mineral labs.

4- Construction materials , wood, textile and plastic materials .

- The established labs . Will be able to conduct most of the analyses required

and allowed by the regulation in force ( other than those

restricted to specialized ministers ) for compliance with the Syrian

standard specifications on all imported and exported materials through

the port .

- The company is conducting a more developed study on the best techniques

allowed for direct operation and utilization of the laboratories or through a

specialized scientific firm .

** Construction of a new northern entrance to tartous port

 

 

 

 

 

 
All publication rights reserved for tartous port general company